AnDa Phase II Solar Park

Installed capacity

110KV

Project type: Centralized PV plant

Mounting structure:   Fixed tilted plane

Installed capacity:100MW

Area:266.7HA

Annual production:160GWh

Operation date:2020.3

Grid voltage level:110KV

Region:ANDA