Utility-Scale Power Plant

Entry name:

Gannan Solar Park

Installed capacity

20MW

  • 32GWh

    Annual production

  • 319040T

    CO2 avoided

  • 17Million

    Annual trees planting

Project type: Centralized PV plant

Mounting structure:   Fixed tilted plane

Installed capacity:20MW

Area:13.3HA

Annual production:32 GWh

Operation date:2016

Grid voltage level:110KV

Region:Heilongjiang